A
|
PEKERJAAN PERSIAPAN
|
|
|
-
-
-
- Administrasi, Dokumentasi, Papan Nama Proyek dan Perizinan
|
|
-
-
-
- Pemberesan Lahan dan Baungan Berangkai
|
|
|
|
B
|
PEKERJAAN STRUKTUR
|
|
- PEKERJAAN TANAH & PONDASI
|
|
|
|
1.
|
Pengukuran dan Bowplank
|
|
|
|
2.
|
Galian Tanah Pondasi Poer
|
|
|
|
3.
|
Galian Tanah Sloot
|
|
|
|
4.
|
Galian Tanah Ruang Lift & Pondasi Tangga
|
|
|
|
5.
|
Galian Tanah Pondasi Batu Kali
|
|
|
|
6.
|
Urugan Kembali
|
|
|
|
7.
|
Urugan Tanah Peninggian Bangunan T.40cm
|
|
|
|
8.
|
Urugan Pasir Bawah Pelat Lantai T.10cm
|
|
|
|
9.
|
Urugan Pasir Bawah Pondasi Poer; Sloof & Pondasi Tangga T.7cm
|
|
|
10.
|
Urugan Pasir Bawah Pondasi Batu Kali T.5cm
|
|
|
|
11.
|
Lantai Kerja Bawah Pondasi Poer; Sloof & Pondasi Tangga 1:3:5 T.5cm
|
|
|
12.
|
Urugan Pasir Bawah Pelat Lantai Pit Lift T.10cm
|
|
|
|
13.
|
Lantai Kerja Bawah Pelat Lantai Pit 1:3:5 T.5cm
|
|
|
|
14.
|
Pengeboran Pondasi Bored Pile O 30cm ~ 7.00 m'
|
|
|
|
|
Pengeboran Pondasi Bored Pile O 30cm
|
|
|
|
15.
|
Pengeboran Pondasi Bored Pile O 35cm ~ 7.00 m'
|
|
|
|
|
Pengeboran Pondasi Bored Pile O 35cm
|
|
|
|
16.
|
Pembangunan Tanah dan Lumpur ke Luar Site
|
|
|
17.
|
Pondasi Bored Pile O 30cm ~ 7.00 m'
|
Tul.70 kg/m3
|
|
|
18.
|
Pondasi Bored Pile O 35cm ~ 7.00 m'
|
Tul.70 kg/m3
|
|
|
19.
|
Pondasi Poer-P1 (0,60x0,60x0,50 m3)
|
Tul. 200 kg/m3
|
|
|
20.
|
Pondasi Poer-P1A (0,50x0,50x0,40 m3)
|
Tul. 160 kg/m3
|
|
|
21.
|
Pondasi Poer-P2 (1,30x0,60x0,60 m3)
|
Tul. 150 kg/m3
|
|
|
22.
|
Pek Sloof Beton 25/40 (SL.1)
|
Tul 150 kg/m3
|
|
|
23.
|
Pek Sloof Beton 25/40 (SL.2)
|
Tul 140 kg/m3
|
|
|
24.
|
Pek Sloof Beton 15/20 (Atas Batu Kali)
|
Tul 140 kg/m3
|
|
|
25.
|
Pek Sloof Beton 12/20 (Dudukan Kaca Tempered)
|
Tul 80 kg/m3
|
|
|
26.
|
Pek. Pelat Lantai Pit Lift T.25 cm
|
Tul 160 kg/m3
|
|
|
27.
|
Pek. Dinding Pit Lift T.20 cm
|
Tul 140 kg/m3
|
|
|
28.
|
Pek. Pondasi Batu Kali 1PC:5PSR
|
|
|
29.
|
Pek. Tangga Batu Kali 1PC:5PSR
|
|
|
30.
|
Pek. Aanstamping Batu Kali T.10 cm
|
|
|
|
|
|
|
- PEKERJAAN STRUKTUR LANTAI DASAR
|
|
|
|
1.
|
Kolom Struktur K.1 O 40 cm
|
Tul.250 kg/m3
|
|
|
2.
|
Kolom Struktur K.2 O 40 cm
|
Tul.190 kg/m3
|
|
|
3.
|
Kolom Struktur K.3 20/30 (Area Lift)
|
Tul.170 kg/m3
|
|
|
4.
|
Kolom Struktur K.4 15/25 (Area Tangga)
|
Tul.180 kg/m3
|
|
|
5.
|
Kolom Praktis 12/12
|
Tul.140 kg/m3
|
|
|
6.
|
Pelat Lantai Beton Rabat T.8 cm (Dalam Bangunan)
|
Tul. Wire Mesh M.5
|
|
|
7.
|
Pelat Lantai Beton Rabat T.8 cm (Selasar Luar)
|
Tul. Wire Mesh M.5
|
|
|
8.
|
Tangga Beton + Pondasi + Balok Bordes (1 Unit)
|
Tul. 160 kg/m3
|
|
|
|
|
|
|
- PEKERJAAN STRUKTUR LANTAI 2
|
|
|
|
1.
|
Kolom Struktur K.1 O 40 cm
|
Tul.250 kg/m3
|
|
|
2.
|
Kolom Struktur K.2 O 40 cm
|
Tul.190 kg/m3
|
|
|
3.
|
Kolom Struktur K.3 20/30 (Area Lift)
|
Tul.170 kg/m3
|
|
|
4.
|
Kolom Struktur K.4 15/25 (Area Tangga)
|
Tul.180 kg/m3
|
|
|
5.
|
Kolom Praktis 12/12
|
Tul.140 kg/m3
|
|
|
6.
|
Balok Struktur Beton B.2-1 30/50
|
Tul.180 kg/m3
|
|
|
7.
|
Balok Struktur Beton B.2-1A 30/50
|
Tul.150 kg/m3
|
|
|
8.
|
Balok Struktur Beton B.3-2 25/50
|
Tul.150 kg/m3
|
|
|
9.
|
Balok Struktur Beton B.3-2A 25/50
|
Tul.140 kg/m3
|
|
|
10.
|
Balok Struktur Beton B.3-3 30/50
|
Tul.180 kg/m3
|
|
|
11.
|
Balok Struktur Beton B.3-4 25/50
|
Tul.170 kg/m3
|
|
|
12.
|
Balok Struktur Beton B.3-5 20/50
|
Tul.115 kg/m3
|
|
|
13.
|
Balok Struktur Beton B.3-5A 20/50
|
Tul.170 kg/m3
|
|
|
14.
|
Balok Struktur Beton B.3-6 25/50
|
Tul.150 kg/m3
|
|
|
15.
|
Balok Struktur Beton B.3-6 20/50
|
Tul.150 kg/m3
|
|
|
16.
|
Pelat Canopy Kusen Beton 15/20
|
Tul.100 kg/m3
|
|
|
17.
|
Pelat Lantai Beton t,12cm
|
Tul.110 kg/m3
|
|
|
18.
|
Sirip Beton Akhiran Plafond 10/30 (Area Tangga & Void)
|
Tul. 60 kg/m3
|
|
|
19.
|
Tangga Beton + Balok Bordes (1 unit)
|
Tul.160 kg/m3
|
|
|
|
|
|
|
IV. PEKERJAAN STRUKTUR LANTAI 3
|
|
|
|
1.
|
Kolom Struktur K.1 O 40 cm
|
Tul.250 kg/m3
|
|
|
2.
|
Kolom Struktur K.3 20/30 (Area Lift)
|
Tul.170 kg/m3
|
|
|
3.
|
Kolom Struktur K.4 15/25 (Area Tangga)
|
Tul.180 kg/m3
|
|
|
4.
|
Kolom Praktis 12/12
|
Tul.140 kg/m3
|
|
|
5.
|
Balok Struktur Beton B.3-1 30/50
|
Tul.180 kg/m3
|
|
|
6.
|
Balok Struktur Beton B.3-1A 30/50
|
Tul.150 kg/m3
|
|
|
7.
|
Balok Struktur Beton B.3-2 30/50
|
Tul.160 kg/m3
|
|
|
8.
|
Balok Struktur Beton B.3-2A 25/50
|
Tul.170 kg/m3
|
|
|
9.
|
Balok Struktur Beton B.3-2B 25/50
|
Tul.150 kg/m3
|
|
|
10.
|
Balok Struktur Beton B.3-2C 25/50
|
Tul.150 kg/m3
|
|
|
11.
|
Balok Struktur Beton B.3-3 30/50
|
Tul.180 kg/m3
|
|
|
12.
|
Balok Struktur Beton B.3-4 25/50
|
Tul.170 kg/m3
|
|
|
13.
|
Balok Struktur Beton B.3-5 20/50
|
Tul.115 kg/m3
|
|
|
14.
|
Balok Struktur Beton B.3-5A 20/50
|
Tul.170 kg/m3
|
|
|
15.
|
Balok Struktur Beton B.3-6 25/40
|
Tul.150 kg/m3
|
|
|
16.
|
Balok Struktur Beton B.3-7 20/40
|
Tul.175 kg/m3
|
|
|
17.
|
Balok Struktur Beton B.3-7 20/30
|
Tul.150 kg/m3
|
|
|
18.
|
Balok Struktur Beton BK.1 30/50 (Konsol)
|
Tul.170 kg/m3
|
|
|
19.
|
Balok Struktur Beton BK.2 25/50 (Konsol)
|
Tul.165 kg/m3
|
|
|
20.
|
Pelat Lantai Beton t,12cm
|
Tul.110 kg/m3
|
|
|
21.
|
Sirip Beton Akhiran Plafond 10/30
|
Tul.60 kg/m3
|
|
|
22.
|
Tangga Beton + Balok Bordes (1 unit)
|
Tul.160 kg/m3
|
|
|
|
|
|
|
V. PEKERJAAN STRUKTUR LANTAI 4
|
|
|
|
1.
|
Kolom Struktur K.1 O 40 cm
|
Tul.250 kg/m3
|
|
|
2.
|
Kolom Struktur K.3 20/30 (Area Lift)
|
Tul.170 kg/m3
|
|
|
3.
|
Kolom Struktur K.4 15/25 (Area Tangga)
|
Tul.180 kg/m3
|
|
|
3a.
|
Kolom Struktur 15/40 t=1,5 Dudukan Ornamen Fasade
|
|
|
4.
|
Kolom Praktis 12/12
|
Tul.140 kg/m3
|
|
|
5.
|
Balok Struktur Beton B.4-1 30/50
|
Tul.180 kg/m3
|
|
|
6.
|
Balok Struktur Beton B.4-1A 30/50
|
Tul.150 kg/m3
|
|
|
7.
|
Balok Struktur Beton B.4-2 30/50
|
Tul.160 kg/m3
|
|
|
8.
|
Balok Struktur Beton B.4-2A 25/50
|
Tul.170 kg/m3
|
|
|
9.
|
Balok Struktur Beton B.4-2B 25/50
|
Tul.150 kg/m3
|
|
|
10.
|
Balok Struktur Beton B.4-2C 25/50
|
Tul.150 kg/m3
|
|
|
11.
|
Balok Struktur Beton B.4-3 30/50
|
Tul.180 kg/m3
|
|
|
12.
|
Balok Struktur Beton B.4-5 20/50
|
Tul.115 kg/m3
|
|
|
13.
|
Balok Struktur Beton B.4-5A 20/50
|
Tul.170 kg/m3
|
|
|
14.
|
Balok Struktur Beton B.4-6 30/40
|
Tul.190 kg/m3
|
|
|
15.
|
Balok Struktur Beton B.4-7 20/40
|
Tul.175 kg/m3
|
|
|
16.
|
Balok Struktur Beton B.4-7 20/30
|
Tul.150 kg/m3
|
|
|
17.
|
Balok Struktur Beton BK.1 30/50 (Konsol)
|
Tul.170 kg/m3
|
|
|
18.
|
Balok Struktur Beton BK.2 25/50 (Konsol)
|
Tul.165 kg/m3
|
|
|
19.
|
Pelat Lantai Beton t,12cm
|
Tul.110 kg/m3
|
|
|
20.
|
Pelat Lantai Beton t,12cm (Tribun)
|
Tul.110 kg/m3
|
|
|
21.
|
Sirip Beton Akhiran Plafond 10/30
|
Tul.60 kg/m3
|
|
|
22.
|
Tangga Beton + Balok Bordes 1 unit
|
Tul.160 kg/m3
|
|
|
|
|
|
|
VI. PEKERJAAN STRUKTUR PELAT ATAP
|
|
|
|
1.
|
Kolom Struktur K.3 20/30 (Area R. Mesin Lift)
|
Tul.170 kg/m3
|
|
|
2.
|
Dinding Beton 26/90 (Dudukan Railing Pagar Besi)
|
Tul.120 kg/m3
|
|
|
2a.
|
Tanggul Beton 15/40
|
|
|
2b.
|
Peninggian Level Rumah Mesin Lift t=40cm Beton 20x40
|
|
|
2c.
|
Kolom Pedestal Dudukan Kuda-Kuda 20x30x40x7 bh
|
|
|
2d.
|
Kolom Pedestal Dudukan Tiang Induk Pipa Besi 10", 40x40x40x1 bh
|
|
|
3.
|
Balok Struktur Beton B.A-1 30/50
|
Tul.180kg/m3
|
|
|
4.
|
Balok Struktur Beton B.A-2 30/50
|
Tul.160kg/m3
|
|
|
5.
|
Balok Struktur Beton B.A-2A 25/50
|
Tul.150kg/m3
|
|
|
6.
|
Balok Struktur Beton B.4-3 30/50
|
Tul.160kg/m3
|
|
|
7.
|
Balok Struktur Beton B.4-5 20/50
|
Tul.115kg/m3
|
|
|
8.
|
Balok Struktur Beton B.4-5A 20/50
|
Tul.170kg/m3
|
|
|
9.
|
Balok Struktur Beton B.4-6 30/50
|
Tul.190kg/m3
|
|
|
10.
|
Balok Struktur Beton B.4-7 20/40
|
Tul.175kg/m3
|
|
|
11.
|
Balok Struktur Beton B.4-8 20/30
|
Tul.150kg/m3
|
|
|
12.
|
Balok Struktur Beton BK.1 30/50 (Konsol)
|
Tul.170kg/m3
|
|
|
13.
|
Balok Struktur Beton BK.2 25/50 (Konsol)
|
Tul.165kg/m3
|
|
|
14.
|
Pelat Lantai Beton t,12cm (R. Mesin & Tanki Air)
|
Tul.110 kg/m3
|
|
|
15.
|
Pelat Lantai Beton t,10cm
|
Tul.130 kg/m3
|
|
|
16.
|
Pelat Lantai Beton t,15cm (Dudukan Mesin Lift)
|
Tul.150 kg/m3
|
|
|
|
|
|
|
VII. PEKERJAAN STRUKTUR PELAT ATAP TANGGA & RUANG MESIN
|
|
|
1.
|
Kolom Struktur K.4 15/25
|
Tul.180 kg/m3
|
|
|
2.
|
Kolom Struktur K.5 20/20
|
Tul.140 kg/m3
|
|
|
3.
|
Balok Struktur Beton 15/230
|
Tul.155 kg/m3
|
|
|
4.
|
Pelat Atap Beton t,10cm
|
Tul 85 kg/m3
|
|
|
5.
|
Tanggul Beton 10/15
|
Tul.60 kg/m3
|
|
|
|
|
|
|
VIII. PEKERJAAN STRUKTUR KUDA-KUDA BAJA
|
|
|
|
1.
|
Pek. Kuda-Kuda Baja (K.3) WF.200.100.4,5.7 (9 unit)
|
|
|
|
2.
|
Pek. Voute WF.200.100.4,5.7
|
|
|
|
3.
|
Pek. Stifneer T.8 cm
|
|
|
|
4.
|
Pek. Base T.16mm
|
|
|
|
5.
|
Pek. Base T.12mm
|
|
|
|
6.
|
Pek. Boud Angker O 19 mm (HTB)
|
|
|
|
7.
|
Pek. Boud Angker O 16 mm (HTB)
|
|
|
|
8.
|
Pek. Gordeng Pipa Baja BSP O 2 1/2' T.2,3mm
|
|
|
|
9.
|
Pek. Besi Plat T.6mm Dudukan Gordeng
|
|
|
|
10.
|
Pek. Pipa Baja Schedule BSP O 10' T.6mm (Tumpuan Kuda-Kuda)
|
|
|
11.
|
Pek. Besi Plat T.6mm Dudukan Kuda-Kuda ke Pipa O 10"
|
|
|
11a
|
Pek. Zincromat Kuda-Kuda dan Tumpuan Gordeng
|
|
|
|
12.
|
Rangka Atap Besi Hollow 2x4, t=1,2mm jarak per 40cm
|
|
|
|
Rangka Atap Besi Hollow 4x4, t=1,4mm jarak per 60cm
|
|
|
13.
|
Penutup Atap Genting Bitumin Single + Multi 9mm Lengkap Aksesoris
|
|
|
|
Penutup Atap Genting Bitumin Single + Multi 12mm Lengkap Aksesoris
|
|
|
14.
|
Penutup Nok Atap Bitumen
|
|
|
|
15.
|
Starter Atap Bitumen
|
|
|
|
|
|
|
C
|
PEKERJAAN ARSITEKTUR
|
|
|
- PEKERJAAN DINDING LANTAI I
|
|
|
|
1.
|
Pas. Dinding 1/2 Bata 1 Pc : 3 Psr (Core Lift)
|
|
|
|
2.
|
Pas. Dinding 1/2 Bata 1 Pc : 3 Psr
|
|
|
|
3.
|
Pas. Dinding 1/2 Bata 1 Pc : 5 Psr
|
|
|
|
4.
|
Pek. Plesteran + Acian 1 Pc : 3 Psr
|
|
|
|
5.
|
Pek. Plesteran + Acian 1 Pc : 5 Psr
|
|
|
|
6.
|
Pek. Plesteran + Acian 1 Pc : 3 Psr Openingan Kusen
|
|
|
6a.
|
Pek. Plesteran + Acian Pondasi Rabat
|
|
|
|
7.
|
Stainless Steel Plate Penutup Kolom Bulat t=1,2 mm finish dop 2B
|
|
|
8.
|
Pas. Dinding Granit Slab, Dinding Core Lift ex. Import T=2cm Nero Asoluto
|
|
|
9.
|
Pas. Balok Lintel/Lantey 15/15
|
|
|
|
9a.
|
Pek. Saluran Air hujan
|
|
|
|
|
|
|
- PEKERJAAN DINDING LANTAI II
|
|
|
|
1.
|
Pas. Dinding 1/2 Bata 1 Pc : 3 Psr (Core Lift)
|
|
|
|
2.
|
Pas. Dinding 1/2 Bata 1 Pc : 3 Psr
|
|
|
|
3.
|
Pas. Dinding 1/2 Bata 1 Pc : 5 Psr
|
|
|
|
4.
|
Pek. Plesteran + Acian 1 Pc : 3 Psr
|
|
|
|
5.
|
Pek. Plesteran + Acian 1 Pc : 5 Psr
|
|
|
|
6.
|
Pek. Plesteran + Acian 1 Pc : 3 Psr Openingan Kusen
|
|
|
7.
|
Pek.Afwerking Beton
|
|
|
|
8.
|
Stainless Steel Plate Penutup Kolom Bulat t=1,2 mm finish dop 2B
|
|
|
9.
|
Pas. Dinding Granit Slab, Dinding Core Lift ex. Import T=2cm Nero Asoluto
|
|
|
10.
|
Pas. Balok Lintel/Lantey 15/15
|
|
|
|
|
|
|
|
- PEKERJAAN DINDING LANTAI III
|
|
|
|
1.
|
Pas. Dinding 1/2 Bata 1 Pc : 3 Psr (Core Lift)
|
|
|
|
2.
|
Pas. Dinding 1/2 Bata 1 Pc : 3 Psr
|
|
|
|
3.
|
Pas. Dinding 1/2 Bata 1 Pc : 5 Psr
|
|
|
Pihak Dipublikasikan |